Installing the right equipment for the job is part of the design process. It’s not always as simple as what is the cheapest. Actually it’s never that simple.

The before. Gates never aligned and always over traveled.

Custom stainless and aluminum hardware.

With LA 400’s we never use the factory rear mounts and on occasion fabricate custom front mounts. On this installation we added silver powder coated plates to mount the front bracket and to also distribute the load on the gate better. Ended up hiding the actuators as well.

Previous
Previous

Project - Replaced 25 year old Doorking 6050 gate operators with new Doorkings

Next
Next

Project -New Installation, Liftmaster CSW200 biparting swing gate operators